The Marist School is an independent Catholic day school for girls aged 2½–18 in Sunninghill near Ascot, Berkshire. The site includes the senior school, the preparatory school, a science block, drama studio, an indoor swimming pool, a music block, large playing fields, netball courts, an AstroTurf pitch and a multi-purpose Sports Hall, officially opened in March 2017 by HRH The Duke of York.
To supply and installation a new audio visual solution in the Sports Hall, including a 6m 16/10 ratio Pro electric screen and NEC PA671W 6700 Lumen projector as well as 6 x Audac PX112 Loudspeakers.
Using a tower, the screen was wall mounted to the vertical steel supports, whereas the projector was ceiling mounted. HDMI and VGA connections were run from the projector over Cat5e to a flush, wall mounted presentation plate.
For the audio solution, Audac Loudspeakers were wall mounted facing the rear of the hall at approx. 10m intervals. The 2 front speakers were run from an Audac 2 channel amplifier; the 4 rear speakers were run from a 4 channel amplifier thus allowing the user to use just the front 2 speakers for smaller presentations. 2 Speakon connectors were presented at the front of the hall for possible future use of 1 or 2 Audac Baso15 base drivers for low-end reinforcement.
An AMC iMix63, 1u Mixer was installed along with the amplifiers within a new 18u 600mm deep floor standing rack cabinet in the storage area to the front of the hall.
We also installed 2 x wired Microphone antennas for wireless mic usage, due to the possibility of wireless mic signal degradation towards the rear of the hall due to the hall being so big.
Our sales team are dedicated to looking after you and as they are not target driven, they will provide a completely soft approach to dealing with your bespoke requirements.
The first part of our service begins with a site survey to assess your needs and develop your bespoke solution.
Place an order with our team, who will be on hand to guide you through. Just get in touch!
All installation and integration of equipment is carried out by our highly skilled team of project managers and qualified engineers, with minimal disruption to your school, business or premises.
Unit 3, Hertfordshire Business Centre,
Alexander Road,
London Colney,
St Albans,
Hertfordshire,
AL2 1JG
Company Number 651 3348 | Copyright 2024